Sloped roof elevation (Mrs. Safiya Begum)
The design was executed for an existing G+1 structure. our client Mrs. Safiya was willing to build second floor, he approached Mr. Iqbal who suggest and prepared draft for Sloped roof design keeping in mind the local weather and construction practices. He discuss the design with me and we further improved it by taking some real site reference and after initial draft and one major correction, the project is finalised and client give green signal for construction. Below you can find the different stages of design progression. 
Existing structure
G+1 will remain untouched
Proposed Second floor plan (by Mr. Iqbal)
Client's Reference
Hand design by Mr. Iqbal
Structure idea
Real site reference from another project
First draft
First Design
Draft for Final Design
Final design
Mrs. Safiya Begum
Published:

Owner

Mrs. Safiya Begum

Published: